Passive construction · Energy retrofit · Geneva, western Switzerland & neighbouring France
Approach
* Passivhaus Designer (CEPH) training and exam
completed at the Energieinstitut Vorarlberg, Dornbirn (Austria).
"Energy performance is won at the design stage, not in the boiler room."
Whether you build or renovate, energy performance is decided early — in design choices, envelope details and materials. At that stage, fixing something costs almost nothing: it is a stroke of the pen. The same mistake found on site costs a hundred times more, and once the building is handed over, the only way left to correct it is to turn up the heating.
NRG positive is the partner that helps you get these decisions right from the start. For buildings — new or renovated — that consume little, last long and need no compensating.
* CEPH — Certified European PassivHouse Designer.
Owners & property managers · Geneva
In Geneva, the heat consumption index (IDC) is no longer just an indicator: above certain thresholds, the law requires an energy audit, then renovation work. Anticipating this deadline means choosing your renovation strategy, your schedule and your subsidies — rather than having them imposed.
Drawing on two years of IDC coordination for the State of Geneva (OCBA), NRG positive helps you read your situation and turn it into a coherent project.
Services
Depending on your project and where you stand, here is what NRG positive can bring.
Consulting · Owner's engineer
Building or renovating? Tailored support from design to site — comprehensive or focused on a specific phase. Passive construction and energy retrofit.
In Geneva, targeting HPE/THPE opens concrete rights — buildable surface bonus (LCI art. 59), external insulation excluded from envelope limits (art. 114A)
Training
Does your team work on high-performance projects? Modules adapted to your context, inter- or in-company, on Passivhaus standards and the building envelope — relevant to any passive construction or high-performance retrofit.
Passivhaus training · independent of any label
Online
Short modules to go deeper at your own pace — principles, retrofit, envelope, labels. First module in beta late 2026.
Your e-mail is used only to notify you of the launch.
Events
Organising a symposium or professional event? Technical talks on passive construction and envelope performance, adapted to your audience.
Holistic approach
New regulatory requirements (LCI art. 117 & 118) demand a holistic view of a building's carbon impact — materials, execution, life cycle. We help you integrate these issues from the design stage: material choices, embodied energy, reuse and recovery. An ecological approach that goes beyond the energy label.
References
Hands-on expertise, project after project.
2006 · Minzier (74) · France
Design and construction — and the first Minergie®-certified house in France (certificate F-74-001, 2006). Designed to the Passivhaus standard and calculated with PHPP. Lived in by its designer for twenty years: today it is the reference building for our training courses.
2019 · France
Complete revision and redesign of the CEPH training materials for Propassif — La Maison Passive, France: the courses that prepare French-speaking designers for certification. Trainer for La Maison Passive / Propassif since 2008, in Paris and Luxembourg.
2021–2023 · Geneva · Carouge
The canton's first "zero waste" construction site: 26 apartments renovated with occupants in place, THQMAT charter and the first Low-COV certificate issued in Geneva. An oil tank converted to rainwater harvesting, feeding the building's toilets.
Resources
In-depth articles to see clearly — labels, materials, standards, embodied energy.
Dossier
Principles, Passivhaus and Minergie®-P standards, concrete benefits for owners and designers.
Read the dossier →
Dossier
When external insulation is impossible: joist ends, dew point, vapour retarders — and the mistakes that lead to mould.
Read the dossier →
Dossier
Why the energy embodied in materials has become a central issue — and how to integrate it from the design stage.
Read the dossier →
Dossier
IDC thresholds and legal obligations, EnerPHit and Minergie®-P retrofit standards, project approach and phasing.
Read the dossier →
Dossier
The envelope component by component, airtightness, ventilation and heating — implementation in existing buildings.
Read the dossier →
Contact
Describe it in a few words — we reply within 48 hours, with no obligation.